I have a small idea, I am in the planning stage of building a roughly 20 sqm glassed-in patio.
And I've got a fixed idea I would like to discuss.
I have a reasonably non-rusty 10-foot container with a broken door that I no longer have use for and came up with the idea of possibly using it as a wine cellar under the new patio.
The idea is as follows:
• Dig a hole.
• Dump down gravel or similar.
• 200mm foam plastic.
• Cast a 100mm concrete slab.
• Spray/foam insulate the outside of the container 100mm.
• Place the container with the opening upwards.
• Build vertical framework inside to withstand the soil masses.
• Refill with gravel or similar.
• Build the patio on top.
• Spiral staircase down with a hatch.
I plan to do all the work myself except for lifting the container into the hole, as that requires a crane truck.
I thought about buying a spray insulation kit from abroad.
Questions:
How long before it rusts through when the sheet metal is on the warm side? 30 years?