Moved a wall in the garage and need to fill approximately 3 square meters with about 45mm height. It will be an ordinary mancave, no heavy loads. What should I do? I will be laying tiles on the floor afterwards.
Yes, leveling the entire surface is an option; approximately 12 bags of 20kg each will be needed. The other option would be to lay a couple of bags of Eps-cement and then level on top of that, if you want to save on the number of bags.
Have to calculate the cost then
how thick must the floating layer at least be on top of any eps?
Should I drill into the slab next to it so I can also insert the reinforcement into it?
Here's what it looks like
Also thought about the drying time for concrete but unsure exactly how long it takes. Anyone know?
And if I lay EPS first, does it need to be completely cured before I proceed with the screed? (how long does it take?)
Also thought about drying time for concrete but unsure exactly how long it takes. Does anyone know?
And if I first lay EPS, does it need to cure completely before I apply the screed? (how long does it take?)